Water heater installed in earthquake zone with out a sufficiently strong enough wall behind the water heaters.
Went through the flimsy 2x2 every 4 foot wall. Anchored to the slab and floor joists for the floor above it. To install the water heater to the left. Straps went through holes cut in the wall and attached to the new structure. Gap between old and new structure was shimmed for support.
#grownoster
These plans need to be reworked because the Bering's mentioned are not all available. But this engine and boiler imstrutions are ment to be built withmosty off the shelf parts. I asked a person that makes solar thermal collector how much collecter to supply this engine on even cloudy days.
The price he quoted was way too high but he stayed it would need 14 square meters of collectors
https://www.greensteamengine.com/
#grownoster