First walls up - Gerrard LWS
LWS slab, basement walkout steps poured and 16" sonotube with bigfoot for spiral stairs - Gerrard
Slab pour - Gerrard LWS
DC avoidance - pivot back to triplex + GS strategy for Coxwell
first and second floor complete - Jones
pre slab gravel and insulation - Gerrard LWS
bulkhead framing & drywall - Gerrard
Investigating helical piles + slab for Jones GS - first floor height is 6" above grade